Send Message
Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Home ProductsUV Cured CIPP

Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair

Certification
China Daoyunai Energy Saving Technology Limited certification
China Daoyunai Energy Saving Technology Limited certification
DAO is a very trustworthy company, I like it. Its UV cure system is very easy to operate, and its liner is pretty good. DAO is my great partner. Johnny

—— Johnny

DAO is my supplier for over five years. Its UV cure system and liner, its CCTV crawler are my great tools to finish trenchless repair underground pipelines. DAO, Amazing! Lily Zhang

—— Lily

I have been dealing with Daoyunai company for underground pipeline trenchless repair for almost seven years. I am the distributor in Jiangxi province. DAO always gives me support to win customers. Win-Win!! Dongzhen

—— Dongzhen

It is very nice to do business with DAO and also Aaron is very helpful. DAO UV liner is very good, stable and fast to cure. I hope to visit your factory in 2023. Ali

—— Ali

I'm Online Chat Now

Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair

Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair
Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair

Large Image :  Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair

Product Details:
Place of Origin: Jiangsu, China
Brand Name: DAO
Payment & Shipping Terms:
Minimum Order Quantity: 1 unit
Price: Variable
Packaging Details: Normal box
Delivery Time: 12 working days
Payment Terms: T/T
Supply Ability: 100 units per year
Detailed Product Description
Function: NO-DIGGING Repair Location: Jobsites
Cable: 54m Controller: NO
Crawler: DN350 Color: Original
High Light:

light uv cipp lining

,

DAO uv cipp linings manufacturers

,

cipp uv lining manufacturers DAO

 

UV CIPP lining of different sizes used for municipal pipes trenchless repair

 

A key step in UV curing construction: inflation and pressure. Before inflation, check whether the pressure detection equipment is normal. If there is any problem, deal with it in time before use.

The whole operation must be carried out in strict accordance with the requirements: the small diameter material has a small stress area and the pressure is too large, while the large diameter material has a large stress area and the pressure is too small. In the process of material inflation, the operator shall observe the pressure at any time and slowly control the pressure rise. After reaching the target pressure, it is necessary to maintain the pressure for a period of time (generally half an hour).

In particular, the operator shall observe whether the stainless steel binding head is loose and whether the material is close to the inner wall of the pipe. If it is not close to the inner wall, the pressure maintaining time can be appropriately extended or the inflation pressure can be appropriately increased.

After pressing and inflating, do not immediately pull the lamp holder to the other end of the material. Turn on the headlight leg after the material pressure of the large pipe diameter rises to the target pressure.

During the pressure maintaining process, the internal conditions of the material must be carefully observed through the internal camera. Whether the inner membrane of the lower lamp material end is damaged and whether there is air intake. You can tell at this time.

When installing the stainless steel binding head, the gas entering the material will soon be discharged through the observation port. If the inner membrane of the material is damaged, the gas inside the material will not decrease slowly, but will increase with the pressing time. If the inner membrane of materials above DN600 is damaged, the tie head can be opened at this time to find the damaged place, and the error can be saved by using adhesive tape to repair it.

 

 Duration:  5 hours
Operating staff:  6 persons
Team:  One team
Application:  CIPP process

 

Light UV CIPP Lining Manufacturers Municipal Pipes Trenchless Sewer Line Repair 0
 

Contact Details
Daoyunai Energy Saving Technology Limited

Contact Person: Aaron Wang

Tel: +8613641967601

Send your inquiry directly to us (0 / 3000)