logo
Send Message
Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Home ProductsUV Cured CIPP

CIPP UV Curing Process Installation Program Underground Space Management Materials

Certification
China Daoyunai Energy Saving Technology Limited certification
China Daoyunai Energy Saving Technology Limited certification
DAO is a very trustworthy company, I like it. Its UV cure system is very easy to operate, and its liner is pretty good. DAO is my great partner. Johnny

—— Johnny

DAO is my supplier for over five years. Its UV cure system and liner, its CCTV crawler are my great tools to finish trenchless repair underground pipelines. DAO, Amazing! Lily Zhang

—— Lily

I have been dealing with Daoyunai company for underground pipeline trenchless repair for almost seven years. I am the distributor in Jiangxi province. DAO always gives me support to win customers. Win-Win!! Dongzhen

—— Dongzhen

It is very nice to do business with DAO and also Aaron is very helpful. DAO UV liner is very good, stable and fast to cure. I hope to visit your factory in 2023. Ali

—— Ali

I'm Online Chat Now

CIPP UV Curing Process Installation Program Underground Space Management Materials

CIPP UV Curing Process Installation Program Underground Space Management Materials
CIPP UV Curing Process Installation Program Underground Space Management Materials CIPP UV Curing Process Installation Program Underground Space Management Materials CIPP UV Curing Process Installation Program Underground Space Management Materials CIPP UV Curing Process Installation Program Underground Space Management Materials

Large Image :  CIPP UV Curing Process Installation Program Underground Space Management Materials

Product Details:
Place of Origin: Jiangsu, China
Brand Name: DAO
Payment & Shipping Terms:
Minimum Order Quantity: 27 m
Price: Variable
Packaging Details: Normal
Delivery Time: 15 working days
Payment Terms: T/T
Supply Ability: 300 km per year
Detailed Product Description
Material: Liner Diameter: DN600
Thickness: 6mm Length: 155m
Weight: Variable Life: 50 Years
Highlight:

cipp uv curing process DAO

Materials for CIPP installation program in underground space management

 

Necessary tools for UV CIPP cure trenchless operation

 

1. One winch with a capacity of more than 3 tons, including a steel wire rope of more than 150m (depending on the length of the repaired pipe). It is best to adjust the speed, and the slower the speed cannot be adjusted, the better.

2. Light curing hose material, bottom film, binding cloth, and lamp film.

3. Ten 1.5-inch and two-inch ties respectively. Buy better and stronger tensioners.

4. Two small water pumps are used to pump water in the well chamber, or two Self-priming pumps.

5. Four interphones, two batteries for field communication.

6. Non-woven fabric or thick carpet 3m*10m, laid on the ground to protect materials.

7. Square timber 50-80cm, ready to be dried.

8. Several vises are used to fine-tune and fix materials at the bottom of the well.

9. Two lifting lugs are used for pulling materials.

10. One 750W axial flow fan is used for forced ventilation of the well chamber.

11. The 4-angle grinder with several cutting blades. It is recommended to use compressed air power.

12. Two traction ropes of 8mm and more than 100m are used to drag the bottom film and steel wire rope.

13. Portable power distribution box is used to supply power to the axial flow fan, small water pump, angle grinder and well lighting fixtures.

14. Several respirators or respirators with filters and goggles.

15. There are several cotton gloves, which are only used for changing bulbs. There are several rubber gloves.

16. One section of the 10m air duct is equipped with a D65 fire connector, and two sections are prepared.

17. 10m hose with 1-inch air compressor connector and air release valve at the other end.

18. The steel pipe is 40cm long and 65cm long, with bearings inside at both ends. It is used to walk the steel wire rope when dragging materials.

19. Several rolls of plastic film are used to protect the stainless steel tie head.

20. More than 10 industrial art knives are used for cutting hoses.

21. Two small crowbars are used to tighten stainless steel ties.

22. Six LED headlights are used for bottom lighting.

 

 Function  Repair sewer
 Application  CIPP UV light cure
 Length  Any length is possible

 

CIPP UV Curing Process Installation Program Underground Space Management Materials 0

Contact Details
Daoyunai Energy Saving Technology Limited

Contact Person: Aaron Wang

Tel: +8613641967601

Send your inquiry directly to us (0 / 3000)