logo
products
PRODUCTS DETAILS
Home > Products >
Sewer UV Cured CIPP Lining Systems Trenchless Construction Site Management DN300

Sewer UV Cured CIPP Lining Systems Trenchless Construction Site Management DN300

MOQ: 1 unit
Price: Variable
Standard Packaging: Normal box
Delivery Period: 2 working days
Payment Method: T/T
Supply Capacity: 100 units per year
Detail Information
Place of Origin
Shanghai
Brand Name
DAO
Function:
Trenchless Training
Location:
Shanghai
Cable:
6m
Controller:
NO
Crawler:
DN300
Color:
Original
Highlight:

DN300 Sewers UV Cured CIPP Trenchless

,

cipp lining systems

,

UV-CIPP Sewer Linings

Product Description

 

UV CIPP cure trenchless construction site management for municipal sewer repair

 

The construction site management regulations require that the construction site should be kept clean, the materials should be cleaned after the completion of the work, the site should be restored to its original appearance, and the pipeline repair construction site is all urban roads or sidewalks, green belts, etc. the site should be kept clean during the field operation, and canvas and other isolation measures should be laid on the ground during the application of chemical materials at the construction site to prevent the chemical materials from polluting the road surface. On site materials, wastes and sundries cleared from pipelines must be stacked neatly. After the repair construction, all materials, sundries, domestic garbage, etc. in the site shall be cleaned. The site shall be cleaned. If mud overflows on the ground, the ground must be cleaned. After the completion of construction, special personnel shall be assigned to inspect the site cleaning.

 

As specified in the general safety technical specification for construction of water resources and hydropower projects, obvious warning signs shall be set at the dangerous places such as wells, holes, pits, ditches and openings on the construction site, and protective measures such as adding cover plates or setting fences shall be taken. According to the requirements, the ventilation shaft and observation well at the pipeline repair construction site shall be covered with protective net after opening the well cover, and the working well shall also be covered for protection when it is not in operation. Conical barrels and connecting tubes shall be arranged around for closed protection, and obvious warning signs shall be set. Non operators are not allowed to approach, and special personnel shall be on duty.

 

 

 Duration:  10 hours
Operating staff:  10 persons
Team:  One team
Application:  CIPP process

 

Sewer UV Cured CIPP Lining Systems Trenchless Construction Site Management DN300 0
 

products
PRODUCTS DETAILS
Sewer UV Cured CIPP Lining Systems Trenchless Construction Site Management DN300
MOQ: 1 unit
Price: Variable
Standard Packaging: Normal box
Delivery Period: 2 working days
Payment Method: T/T
Supply Capacity: 100 units per year
Detail Information
Place of Origin
Shanghai
Brand Name
DAO
Function:
Trenchless Training
Location:
Shanghai
Cable:
6m
Controller:
NO
Crawler:
DN300
Color:
Original
Minimum Order Quantity:
1 unit
Price:
Variable
Packaging Details:
Normal box
Delivery Time:
2 working days
Payment Terms:
T/T
Supply Ability:
100 units per year
Highlight

DN300 Sewers UV Cured CIPP Trenchless

,

cipp lining systems

,

UV-CIPP Sewer Linings

Product Description

 

UV CIPP cure trenchless construction site management for municipal sewer repair

 

The construction site management regulations require that the construction site should be kept clean, the materials should be cleaned after the completion of the work, the site should be restored to its original appearance, and the pipeline repair construction site is all urban roads or sidewalks, green belts, etc. the site should be kept clean during the field operation, and canvas and other isolation measures should be laid on the ground during the application of chemical materials at the construction site to prevent the chemical materials from polluting the road surface. On site materials, wastes and sundries cleared from pipelines must be stacked neatly. After the repair construction, all materials, sundries, domestic garbage, etc. in the site shall be cleaned. The site shall be cleaned. If mud overflows on the ground, the ground must be cleaned. After the completion of construction, special personnel shall be assigned to inspect the site cleaning.

 

As specified in the general safety technical specification for construction of water resources and hydropower projects, obvious warning signs shall be set at the dangerous places such as wells, holes, pits, ditches and openings on the construction site, and protective measures such as adding cover plates or setting fences shall be taken. According to the requirements, the ventilation shaft and observation well at the pipeline repair construction site shall be covered with protective net after opening the well cover, and the working well shall also be covered for protection when it is not in operation. Conical barrels and connecting tubes shall be arranged around for closed protection, and obvious warning signs shall be set. Non operators are not allowed to approach, and special personnel shall be on duty.

 

 

 Duration:  10 hours
Operating staff:  10 persons
Team:  One team
Application:  CIPP process

 

Sewer UV Cured CIPP Lining Systems Trenchless Construction Site Management DN300 0
 

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.