logo
products
PRODUCTS DETAILS
Home > Products >
Ultraviolet UV Cured CIPP Installation Underground Drainage Repair

Ultraviolet UV Cured CIPP Installation Underground Drainage Repair

MOQ: 67 m
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 400 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Impregnated Liner
Diameter:
DN800
Thickness:
9mm
Length:
185m
Weight:
Variable
Life:
50 Years
Highlight:

DAO UV CIPP Installation Repair

,

DAO Ultraviolet UV CIPP Repair

,

Ultraviolet UV CIPP Repair DAO

Product Description

UV CIPP installation for repairing underground pipelines by no excavation

 

Apparatus required for UV curing construction:

1-UV curing equipment: core equipment, highly integrated electrified computer automatic control, Internet of things, ensuring stable and reliable performance. The power reaches 12000W ultraviolet lamp, and the whole process of video monitoring.

2-Blower: used to fully expand the hose to ensure that the material is fully deployed. 500 cubic meters per hour is required.

3-Generator: three-phase generator to ensure the power of outdoor operation. 48kW output power, equipped with voltage regulator.

4-Hose material: UV curing hose, base material: glass fiber and resin, fully pre impregnated, high elastic modulus.

5-Curing repair integrated vehicle: integrate curing equipment, blower, generator, etc. into the vehicle.

 

Pretreatment:

According to the prepared pipeline inspection and evaluation scheme, the pipeline that needs to be repaired is selected as the highest priority and pretreated to ensure that the pipeline is clean without ponding. It mainly includes plugging, cleaning, water plugging, pumping and spot repair.

Then test again to ensure that the next step can be carried out. While the robot detects, a long enough rope is brought into the pipeline.

 

 Function  Fixing pipe defects
 Application  CIPP trenchless
 Length  Any length is possible

 

Ultraviolet UV Cured CIPP Installation Underground Drainage Repair 0

Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

A
Abdul
Saudi Arabia May 31.2024
The CCTV video inspection robot works great; its HD camera makes the pipe clearer to see. Its crawler is powerful and can overcome many complex situations.
J
Jackson
South Africa Apr 29.2024
The inflatable pipe plugs are very easy to handle at job sites. Our guys like to plug the sewers. This is necessary for us. It can hold high pressure for sewer. No worry for jobs.
Z
Zhang Fugui
China (Mainland) Feb 22.2024
Daoyunai UV liner uses a special structure; its external layer is stronger against scratching and water flow.
products
PRODUCTS DETAILS
Ultraviolet UV Cured CIPP Installation Underground Drainage Repair
MOQ: 67 m
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 400 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Impregnated Liner
Diameter:
DN800
Thickness:
9mm
Length:
185m
Weight:
Variable
Life:
50 Years
Minimum Order Quantity:
67 m
Price:
Variable
Packaging Details:
Normal
Delivery Time:
15 working days
Payment Terms:
T/T
Supply Ability:
400 km per year
Highlight

DAO UV CIPP Installation Repair

,

DAO Ultraviolet UV CIPP Repair

,

Ultraviolet UV CIPP Repair DAO

Product Description

UV CIPP installation for repairing underground pipelines by no excavation

 

Apparatus required for UV curing construction:

1-UV curing equipment: core equipment, highly integrated electrified computer automatic control, Internet of things, ensuring stable and reliable performance. The power reaches 12000W ultraviolet lamp, and the whole process of video monitoring.

2-Blower: used to fully expand the hose to ensure that the material is fully deployed. 500 cubic meters per hour is required.

3-Generator: three-phase generator to ensure the power of outdoor operation. 48kW output power, equipped with voltage regulator.

4-Hose material: UV curing hose, base material: glass fiber and resin, fully pre impregnated, high elastic modulus.

5-Curing repair integrated vehicle: integrate curing equipment, blower, generator, etc. into the vehicle.

 

Pretreatment:

According to the prepared pipeline inspection and evaluation scheme, the pipeline that needs to be repaired is selected as the highest priority and pretreated to ensure that the pipeline is clean without ponding. It mainly includes plugging, cleaning, water plugging, pumping and spot repair.

Then test again to ensure that the next step can be carried out. While the robot detects, a long enough rope is brought into the pipeline.

 

 Function  Fixing pipe defects
 Application  CIPP trenchless
 Length  Any length is possible

 

Ultraviolet UV Cured CIPP Installation Underground Drainage Repair 0

sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.