logo
products
PRODUCTS DETAILS
Home > Products >
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

MOQ: 50m
Price: Variable
Standard Packaging: Customized as required
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 300 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Liner:
Wet
Diameter:
DN850
Thickness:
9mm
Length:
70m
Weight:
Variable
Life:
50 Years
Highlight:

cured in place sewer pipe liner

,

cured in place pipe liner contractors

,

cured-in-place pipe liner material

Product Description

Wet liner for CIPP UV renovation of underground pipes by no digging method

 

Pull the lamp rope with the reserved rope

The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape. Especially for the rope end of the lamp rope, it is easy to cause the inner membrane to scratch during the dragging process.

In the process of pulling the lamp rope down into the material with the reserved rope, it must be operated when the material is inflated. Otherwise, it is easy to cause inner membrane damage.

 

Lower lamp

Under the light of the link is the most cause intimal damage. Be careful. Before lowering the lamp, check the lamp wheel, lamp body, and connecting wire for burrs and resin. If any, clean it and treat the wheel smoothly. If it is a headlamp wheel, it is recommended to wipe a small amount of grease to reduce the friction of the material's inner membrane when the headlamp is lifted and lowered.

 

During the process of lowering the lamp, it is necessary to ensure that the material bulges up and the lamp enters the material smoothly without obstacles. If it cannot enter smoothly, it is necessary to find out the reasons for the obstacles. It is not allowed to drag or kick. Most of the inner membrane damage occurs at this time. The lamp shall be pulled into the material as far as possible, and sufficient length shall be reserved for the binding head for easy operation to avoid hindering the lifting of the headlamp.

 

 Material  Wet liner
 Technology applied  TT
 Length  Any length is possible

 

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging 0

products
PRODUCTS DETAILS
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging
MOQ: 50m
Price: Variable
Standard Packaging: Customized as required
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 300 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Liner:
Wet
Diameter:
DN850
Thickness:
9mm
Length:
70m
Weight:
Variable
Life:
50 Years
Minimum Order Quantity:
50m
Price:
Variable
Packaging Details:
Customized as required
Delivery Time:
15 working days
Payment Terms:
T/T
Supply Ability:
300 km per year
Highlight

cured in place sewer pipe liner

,

cured in place pipe liner contractors

,

cured-in-place pipe liner material

Product Description

Wet liner for CIPP UV renovation of underground pipes by no digging method

 

Pull the lamp rope with the reserved rope

The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape. Especially for the rope end of the lamp rope, it is easy to cause the inner membrane to scratch during the dragging process.

In the process of pulling the lamp rope down into the material with the reserved rope, it must be operated when the material is inflated. Otherwise, it is easy to cause inner membrane damage.

 

Lower lamp

Under the light of the link is the most cause intimal damage. Be careful. Before lowering the lamp, check the lamp wheel, lamp body, and connecting wire for burrs and resin. If any, clean it and treat the wheel smoothly. If it is a headlamp wheel, it is recommended to wipe a small amount of grease to reduce the friction of the material's inner membrane when the headlamp is lifted and lowered.

 

During the process of lowering the lamp, it is necessary to ensure that the material bulges up and the lamp enters the material smoothly without obstacles. If it cannot enter smoothly, it is necessary to find out the reasons for the obstacles. It is not allowed to drag or kick. Most of the inner membrane damage occurs at this time. The lamp shall be pulled into the material as far as possible, and sufficient length shall be reserved for the binding head for easy operation to avoid hindering the lifting of the headlamp.

 

 Material  Wet liner
 Technology applied  TT
 Length  Any length is possible

 

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging 0

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.