Product Details:
Payment & Shipping Terms:
|
Curing Environment: | UV Equipment D919 | Durability: | 50 Years |
---|---|---|---|
Curing Time: | 2-4 Hours | Purpose: | UV Lining For No Dig Sewer Repair |
Maintenance: | Low | Installation: | Pull-in |
Installation Time: | 2-4 Hours | Temperature: | 60-120 Degrees |
Highlight: | Sewer Repair UV liner,No Dig UV liner,Large Scale Construction UV liner |
The UV CIPP Lining is a revolutionary product designed for efficient and cost-effective sewer repair without the need for extensive digging. With a quick installation time of 2-4 hours, this product saves time and labor costs, while providing a long-lasting solution for sewer line issues.
The purpose of this product is to provide a no dig solution for sewer repair. This liner is designed to be inserted into the existing sewer pipe and cured in place using UV light. This eliminates the need for disruptive and costly excavation, making it an ideal choice for urban areas or properties with limited access.
The curing time for this UV liner is also quick, taking only 2-4 hours. This is significantly faster than traditional CIPP (Cured-in-Place Pipe) lining methods, which can take up to 24 hours to cure. This means that the sewer line can be back in service in a shorter amount of time, minimizing disruption to daily activities.
The UV CIPP Lining is also designed to withstand a wide range of temperatures, from 60-120 degrees. This makes it suitable for use in various climates and environments, ensuring its durability and longevity.
The installation of this product is done using a blower or compressor, which allows for precise and controlled pressure during the curing process. This ensures that the liner is evenly and securely bonded to the existing pipe, providing a seamless and leak-free solution.
In addition to its efficiency and effectiveness, the UV CIPP Lining is also offered at a good price point. This makes it a cost-effective choice for sewer repair, as it eliminates the need for expensive excavation and replacement of pipes.
Overall, the UV CIPP Lining is a game-changing product in the field of sewer repair. Its quick installation time, no dig solution, fast curing time, temperature resistance, and cost-effectiveness make it a top choice for both residential and commercial properties. With this product, sewer line issues can be resolved efficiently and without the disruption and expense of traditional repair methods.
Product Name | UV CIPP Liner |
---|---|
Installation | Pull-in |
Installation Time | 2-4 Hours |
Temperature | 60-120 Degrees |
Maintenance | Low |
Warranty | 6 Months |
Durability | 50 Years |
Purpose | UV Lining For No Dig Sewer Repair |
Material | Resin-impregnated Fiberglass |
Curing Time | 2-4 Hours |
UV CIPP Lining, also known as UV cured-in-place-pipe lining, is a revolutionary technology used in sewer repair without the need for traditional digging and excavation methods. This innovative product is designed and manufactured by DAO in China with ISO9001 certification, ensuring its high quality and reliability.
The UV CIPP liner is a type of liner that is impregnated with resin and then inserted into a damaged sewer pipe using a pull-in installation method. Once in place, UV light is used to cure the resin and harden the liner, creating a strong and durable pipe within the existing one. This process can be completed in just 2-4 hours, making it a quick and efficient solution for sewer repairs.
The UV CIPP liner is ideal for use in a variety of sewer repair situations, including but not limited to:
The minimum order quantity for UV CIPP lining is 10 meters, with a variable price depending on the quantity ordered. The product is packaged in a box and can be delivered in containers within 1-2 weeks, subject to payment terms. With a supply ability of 500km per year, DAO can fulfill orders of any size or urgency.
The UV CIPP liner from DAO is a game-changing product in the sewer repair industry, offering a fast, efficient, and cost-effective solution for damaged pipes. Its innovative design and high-quality materials make it a reliable choice for both commercial and residential use. With low maintenance requirements and a wide range of applications, the UV CIPP liner is the ideal choice for any no dig sewer repair project.
Brand Name: DAO
Model Number: UV Liner
Place of Origin: China
Certification: ISO9001
Minimum Order Quantity: 10 meters
Price: variable
Packaging Details: box in container
Delivery Time: 1-2 weeks
Payment Terms: variable
Supply Ability: 500km per year
UV Lining For No Dig Sewer Repair
Package:
UV CIPP Lining is packaged in standard 6m lengths and is carefully wrapped in plastic film to ensure protection during shipping. Each package contains 10 lengths of UV CIPP Lining, totaling to 60 meters per package.
Shipping:
UV CIPP Lining is shipped in sturdy wooden crates to prevent any damage during transportation. The crates are labeled with product details and handling instructions for easy identification and safe handling. We offer worldwide shipping options and use reliable carriers to ensure timely and safe delivery of our products to our customers.
Contact Person: Aaron Wang
Tel: +8613641967601