logo
products
PRODUCTS DETAILS
Home > Products >
Integrated UV CIPP Equipment D919 For No Digging Repair Underground Sewers

Integrated UV CIPP Equipment D919 For No Digging Repair Underground Sewers

MOQ: 1 unit
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 130 units per year
Detail Information
Place of Origin
Jiangsu
Brand Name
DAO
Model Number
D919
Function:
UV CIPP Curing
Units:
Controller, Curing, Light And Blowing
Light:
LED Or High Voltage
Diameter:
DN200-1650
Warranty:
12 Months
Controller:
Hand Touch
Highlight:

Repair Underground Sewers UV Cured CIPP

,

Integrated UV CIPP Equipment

,

UV CIPP Equipment D919

Product Description

Integrated UV CIPP Equipment D919 for No digging repair of underground sewers

 

Integrated UV CIPP D919 is very compact. Trenchless rehab with Daoyunai is faster, higher, and easier. UV CIPP process is perfect to fix underground sewers’ defects, by no digging, a trenchless method. The materials are pulled into the sewer and then to be cured by UV equipment quickly. This process will build a new lining inside the existing sewer, with structural strength. Daoyunai produces the liner and UV equipment. Please visit www.cipp-uv.com for more info.

 

A section of 50 meters of the underground #sewer with the diameter of DN1650 was repaired without excavation by UV CIPP #Trenchless Technology. UV CIPP trenchless technology is very easy to fix the underground sewers by inserting the liner into the pipe through the exiting manhole, and no need to dig. Daoyunai manufactures the liner from DN200 up to DN1800 with the required thickness.

 

Function UV CIPP curing underground sewer
Units controller, curing, light and blowing
Warranty 12 months

 

 

Integrated UV CIPP Equipment D919 For No Digging Repair Underground Sewers 0

 

CIPP UV Cure Equipment D919 Specification.pdf

products
PRODUCTS DETAILS
Integrated UV CIPP Equipment D919 For No Digging Repair Underground Sewers
MOQ: 1 unit
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 130 units per year
Detail Information
Place of Origin
Jiangsu
Brand Name
DAO
Model Number
D919
Function:
UV CIPP Curing
Units:
Controller, Curing, Light And Blowing
Light:
LED Or High Voltage
Diameter:
DN200-1650
Warranty:
12 Months
Controller:
Hand Touch
Minimum Order Quantity:
1 unit
Price:
Variable
Packaging Details:
Normal
Delivery Time:
15 working days
Payment Terms:
T/T
Supply Ability:
130 units per year
Highlight

Repair Underground Sewers UV Cured CIPP

,

Integrated UV CIPP Equipment

,

UV CIPP Equipment D919

Product Description

Integrated UV CIPP Equipment D919 for No digging repair of underground sewers

 

Integrated UV CIPP D919 is very compact. Trenchless rehab with Daoyunai is faster, higher, and easier. UV CIPP process is perfect to fix underground sewers’ defects, by no digging, a trenchless method. The materials are pulled into the sewer and then to be cured by UV equipment quickly. This process will build a new lining inside the existing sewer, with structural strength. Daoyunai produces the liner and UV equipment. Please visit www.cipp-uv.com for more info.

 

A section of 50 meters of the underground #sewer with the diameter of DN1650 was repaired without excavation by UV CIPP #Trenchless Technology. UV CIPP trenchless technology is very easy to fix the underground sewers by inserting the liner into the pipe through the exiting manhole, and no need to dig. Daoyunai manufactures the liner from DN200 up to DN1800 with the required thickness.

 

Function UV CIPP curing underground sewer
Units controller, curing, light and blowing
Warranty 12 months

 

 

Integrated UV CIPP Equipment D919 For No Digging Repair Underground Sewers 0

 

CIPP UV Cure Equipment D919 Specification.pdf

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.