Special lifting frame of professional pipeline CCTV inspection equipment robot
Basic requirements of UV CIPP CCTV inspection trenchless technology
The enclosure of the construction site shall be closed without a gap, and the construction equipment and materials shall not be placed outside the enclosure area.
The temporary parking area for engineering vehicles and the storage area for testing equipment shall be set in the pipeline testing operation area, and the spacing of each zone shall not be less than 1m. See attached Fig. 32 for the plane layout
The local repair work area shall be provided with a work vehicle parking area, material stacking area, and tools and equipment storage area. The safe distance between each partition and enclosure shall not be less than 050m. See attached Fig. 3.3 for the plane layout
The layout of the overall repair work area shall comply with the following provisions a) work vehicle parking area, material stacking area, tool, and equipment storage area, emergency material stacking area, and waste material stacking area shall be set, and the safe distance between each partition and enclosure shall not be less than 0.5m; b) The layout of the operation area and the laying down of facilities shall comply with the figure.
1 - construction signboard (nine signboards and one drawing); 2. One-shot flashing lamp (for night construction); 3 - traffic bucket; 4 - construction vehicles; 5-6-a warning light (for night construction) in the blanking area of construction operation; 7 - placement of construction equipment; 8 - pipe section to be operated; 9 - emergency materials storage area; 10 - stacking area of construction materials; 11 a traffic cone; 12. Auxiliary vehicles for construction; 13 - temporary stacking area for construction waste; 14 - safety fence
Function: | Lifting CCTV camera |
Temperature: | -10°C-55°C |
Power | Motor |