logo
products
PRODUCTS DETAILS
Home > Products >
Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg

Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg

MOQ: 1 piece
Price: Variable
Standard Packaging: Normal
Delivery Period: 10 working days
Payment Method: T/T
Supply Capacity: 500pcs per month
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
D919
Application:
Size Extension
Diameter:
DN250
Length:
0.2m
Brand:
DAO
Material:
Stainless Steel
Life:
50 Years
Highlight:

Cured-In-Place-Pipe UV curing equipments DAO

,

UV Curing Equipment Pipelines

,

cured in place pipe rehabilitations DAO

Product Description

D919 UV curing equipment pipeline inspection and repair equipment custom lamp bracket leg

 

Requirement for UV trenchless repair construction

 

Occupying a road that affects the safety and smoothness of road traffic, such as stacking objects, construction operations, opening up passages, setting up steps, gate slopes, advertisements, etc., shall be subject to the consent of the traffic management department of the public security organ.

The construction unit that has been approved to occupy the road for construction shall publicize it to the public in advance and comply with the following provisions:

(1) Carry out the construction within the approved road section and time;

(2) Barricades shall be set around the operation area. Lighting equipment shall be set and turned on on the barricade facilities at night, except for the setting of traffic signs, traffic facilities, and traffic markings.

(3) Construction signs or danger warning signs shall be set at a place not less than 50 meters away from the direction of incoming vehicles, At night, reflective construction signs or danger warning signs shall be set at a place not less than 100m away from the direction of incoming vehicles.

(4) Construction workers shall wear reflective clothing as required. When crossing the carriageway, they shall go straight through and pay attention to avoiding passing vehicles.

(5) After the construction operation is completed, the damaged road surface shall be repaired and the site remains shall be removed.

 

 How  For different pipes
 Application  Sewers
 QTY  Any

 

Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg 0

Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

M
Martin
Hong Kong Jul 19.2024
The pump is so powerful for draining water from the deep sewer to far away. Its adjustable controller makes the job easier to control.
Z
Zhang Fugui
China (Mainland) Feb 22.2024
Daoyunai UV liner uses a special structure; its external layer is stronger against scratching and water flow.
J
Jorge
Brazil Nov 24.2023
The special design of this UV CIPP equipment from DN200-1500 is very powerful and useful; it can be shipped anywhere. And its operation by PLC is very simple.
products
PRODUCTS DETAILS
Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg
MOQ: 1 piece
Price: Variable
Standard Packaging: Normal
Delivery Period: 10 working days
Payment Method: T/T
Supply Capacity: 500pcs per month
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
D919
Application:
Size Extension
Diameter:
DN250
Length:
0.2m
Brand:
DAO
Material:
Stainless Steel
Life:
50 Years
Minimum Order Quantity:
1 piece
Price:
Variable
Packaging Details:
Normal
Delivery Time:
10 working days
Payment Terms:
T/T
Supply Ability:
500pcs per month
Highlight

Cured-In-Place-Pipe UV curing equipments DAO

,

UV Curing Equipment Pipelines

,

cured in place pipe rehabilitations DAO

Product Description

D919 UV curing equipment pipeline inspection and repair equipment custom lamp bracket leg

 

Requirement for UV trenchless repair construction

 

Occupying a road that affects the safety and smoothness of road traffic, such as stacking objects, construction operations, opening up passages, setting up steps, gate slopes, advertisements, etc., shall be subject to the consent of the traffic management department of the public security organ.

The construction unit that has been approved to occupy the road for construction shall publicize it to the public in advance and comply with the following provisions:

(1) Carry out the construction within the approved road section and time;

(2) Barricades shall be set around the operation area. Lighting equipment shall be set and turned on on the barricade facilities at night, except for the setting of traffic signs, traffic facilities, and traffic markings.

(3) Construction signs or danger warning signs shall be set at a place not less than 50 meters away from the direction of incoming vehicles, At night, reflective construction signs or danger warning signs shall be set at a place not less than 100m away from the direction of incoming vehicles.

(4) Construction workers shall wear reflective clothing as required. When crossing the carriageway, they shall go straight through and pay attention to avoiding passing vehicles.

(5) After the construction operation is completed, the damaged road surface shall be repaired and the site remains shall be removed.

 

 How  For different pipes
 Application  Sewers
 QTY  Any

 

Cured-In-Place-Pipe UV Curing Equipment CIPP Pipe Rehabilitation Lamp Bracket Leg 0

sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.