logo
products
PRODUCTS DETAILS
Home > Products >
Trenchless Sewer Pipe UV Lining Equipment For Sale Headlamp Wheel Rack

Trenchless Sewer Pipe UV Lining Equipment For Sale Headlamp Wheel Rack

MOQ: 1 piece
Price: Variable
Standard Packaging: Normal
Delivery Period: 10 working days
Payment Method: T/T
Supply Capacity: 300pcs per month
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
D919
Application:
Extension
Diameter:
DN350
Length:
0.5m
Brand:
DAO
Material:
Steel
Life:
50 Years
Highlight:

sewer pipe lining equipments for sale

,

trenchless pipe lining equipments DAO

,

uv cured pipe lining

Product Description

Advanced customized headlamp wheel rack of UV curing equipment manufacturer

 

Operation process of UV CIPP curing repair technology

 

Ultraviolet UV CIPP light-curing repair technology is used for the overall trenchless repair of underground municipal drainage pipes.

 

The pipe diameter covers typical sizes. It is a process of in-situ curing method. The repair length can pass through several sections of a manhole at a time, ranging from 50m to 200m. The repair time is 3-6 hours. It is mainly aimed at sewage pipes and rainwater pipes and is applicable to various common pipes, such as plastic pipes, concrete reinforced pipes, cast iron pipes, brick pipes, etc. It is widely used all over the world because of its wide range of applications, fast construction speed, and superior performance of repair materials.

 

The in-situ curing method, which originated in Britain in the 1970s, is called cured in place pipe in English, or CIPP for short. It forms a complete and new pipeline with structural strength inside the existing pipeline.

 

The basic process is to cut the corresponding length of the pre-impregnated resin hose (glass fiber or non-woven fabric) according to the length of the pipeline to be repaired, then put the hose into the pipeline to be repaired through specific processes, such as turning and dragging, and then solidify the hose through corresponding equipment, such as hot water boiler heating, steam heating or ultraviolet light irradiation, so as to achieve the purpose of repair.

 

UV CIPP, as a process of in-situ curing, refers to putting the glass fiber hose impregnated with resin into the pipeline by dragging, and then irradiating it with UV equipment to quickly cure and complete the repair.

 

 How  Fixed length for different pipes
 Application  Sewers
 QTY  Any

 

Trenchless Sewer Pipe UV Lining Equipment For Sale Headlamp Wheel Rack 0

products
PRODUCTS DETAILS
Trenchless Sewer Pipe UV Lining Equipment For Sale Headlamp Wheel Rack
MOQ: 1 piece
Price: Variable
Standard Packaging: Normal
Delivery Period: 10 working days
Payment Method: T/T
Supply Capacity: 300pcs per month
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
D919
Application:
Extension
Diameter:
DN350
Length:
0.5m
Brand:
DAO
Material:
Steel
Life:
50 Years
Minimum Order Quantity:
1 piece
Price:
Variable
Packaging Details:
Normal
Delivery Time:
10 working days
Payment Terms:
T/T
Supply Ability:
300pcs per month
Highlight

sewer pipe lining equipments for sale

,

trenchless pipe lining equipments DAO

,

uv cured pipe lining

Product Description

Advanced customized headlamp wheel rack of UV curing equipment manufacturer

 

Operation process of UV CIPP curing repair technology

 

Ultraviolet UV CIPP light-curing repair technology is used for the overall trenchless repair of underground municipal drainage pipes.

 

The pipe diameter covers typical sizes. It is a process of in-situ curing method. The repair length can pass through several sections of a manhole at a time, ranging from 50m to 200m. The repair time is 3-6 hours. It is mainly aimed at sewage pipes and rainwater pipes and is applicable to various common pipes, such as plastic pipes, concrete reinforced pipes, cast iron pipes, brick pipes, etc. It is widely used all over the world because of its wide range of applications, fast construction speed, and superior performance of repair materials.

 

The in-situ curing method, which originated in Britain in the 1970s, is called cured in place pipe in English, or CIPP for short. It forms a complete and new pipeline with structural strength inside the existing pipeline.

 

The basic process is to cut the corresponding length of the pre-impregnated resin hose (glass fiber or non-woven fabric) according to the length of the pipeline to be repaired, then put the hose into the pipeline to be repaired through specific processes, such as turning and dragging, and then solidify the hose through corresponding equipment, such as hot water boiler heating, steam heating or ultraviolet light irradiation, so as to achieve the purpose of repair.

 

UV CIPP, as a process of in-situ curing, refers to putting the glass fiber hose impregnated with resin into the pipeline by dragging, and then irradiating it with UV equipment to quickly cure and complete the repair.

 

 How  Fixed length for different pipes
 Application  Sewers
 QTY  Any

 

Trenchless Sewer Pipe UV Lining Equipment For Sale Headlamp Wheel Rack 0

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.