logo
products
PRODUCTS DETAILS
Home > Products >
Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig

MOQ: 68m
Price: Variable
Standard Packaging: Variable
Delivery Period: 15 workding days
Payment Method: T/T
Supply Capacity: 300km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
DN1800
Material:
Non-woven Felts With Resin
Structure:
6 Layers
Diameter:
DN1800
Thickness:
19mm
Color:
Original
Length:
190m
Highlight:

DAO Cured in Place Pipe CIPP Water Inversions

,

CIPP Water Inversion Hot water cure

,

DAO CIPP NO Digs

Product Description

Hot water cure and inversion material for underground pipes repair NO Digging

 

The hot water cure liner trenchless repair construction process is mainly divided into two parts: Material Factory fabrication and construction site inversion:

 

(1) Material factory fabrication

Factory fabrication of materials mainly includes three steps:

① Cut off the length of the hose according to the engineering design requirements, and calculate the quantity of resin and other materials;

② Fully vacuum the turnover soft cylinder, so that the resin can fully soak the felt layer;

③ Put the resin and curing agent into the mixing barrel according to a certain proportion for full mixing. After mixing them evenly, pour them into the turnover soft barrel, and evenly pour the resin into the soft barrel through the turnover pressing platform to form the turnover repair material;

 

2) Construction site inversion

Before inverting, it is necessary to ensure that the pipeline meets the conditions. Therefore, before inverting, the pipeline shall be blocked, drained, and dredged accordingly. If necessary, the internal part of the pipeline shall be treated (such as local deformation recovery), so as to ensure that the quality of the overturned lining meets the requirements.

Before the materials enter the site, a turnover platform shall be set up at the inversion wellhead.

 

(3) Heating

A hot water boiler is used to heat the flexible liner cylinder circularly. By continuously raising the temperature of the water in the pipeline, the resin will react. After reaching a certain temperature (about 85 ℃) for a certain time, the pipeline repair will be cured and completed.

 

(4) Tail end treatment

After the pipe is cooled, the excess part at the tail end of the pipe shall be cut off to keep it level with the pipe orifice. At the same time, the pipe interface shall be grouted to integrate the new pipe and the old pipe, so as to complete the CIPP lining repair of the pipe.

 

Function  Underground pipe repair
Inversion  Water
Cure  Hot water
Diameters  DN1800mm

 

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig 0

Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
0%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

5
50 Years Lifespan UV LED Cured Repair Lining 8”To 64”System With One Year Warranty
Russian Federation Aug 4.2025
Daoyunai UV CIPP machine has two light technologies: LED or mercury bulbs. Both work well here. Good for customers to choose.
6
60 - 120 Degrees Temperature UV CIPP Liner For Sewer Pipes And Tubes
Australia Jun 12.2025
The UV curing liner is really amazing, its special design makes the installation much easier and less worry.
U
UV Pipe Lining Trenchless Sewer Repair Services Municipal Pipelines Maintenance Assessment
China (Mainland) Feb 22.2024
Daoyunai UV liner uses a special structure; its external layer is stronger against scratching and water flow.
products
PRODUCTS DETAILS
Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig
MOQ: 68m
Price: Variable
Standard Packaging: Variable
Delivery Period: 15 workding days
Payment Method: T/T
Supply Capacity: 300km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
DN1800
Material:
Non-woven Felts With Resin
Structure:
6 Layers
Diameter:
DN1800
Thickness:
19mm
Color:
Original
Length:
190m
Minimum Order Quantity:
68m
Price:
Variable
Packaging Details:
Variable
Delivery Time:
15 workding days
Payment Terms:
T/T
Supply Ability:
300km per year
Highlight

DAO Cured in Place Pipe CIPP Water Inversions

,

CIPP Water Inversion Hot water cure

,

DAO CIPP NO Digs

Product Description

Hot water cure and inversion material for underground pipes repair NO Digging

 

The hot water cure liner trenchless repair construction process is mainly divided into two parts: Material Factory fabrication and construction site inversion:

 

(1) Material factory fabrication

Factory fabrication of materials mainly includes three steps:

① Cut off the length of the hose according to the engineering design requirements, and calculate the quantity of resin and other materials;

② Fully vacuum the turnover soft cylinder, so that the resin can fully soak the felt layer;

③ Put the resin and curing agent into the mixing barrel according to a certain proportion for full mixing. After mixing them evenly, pour them into the turnover soft barrel, and evenly pour the resin into the soft barrel through the turnover pressing platform to form the turnover repair material;

 

2) Construction site inversion

Before inverting, it is necessary to ensure that the pipeline meets the conditions. Therefore, before inverting, the pipeline shall be blocked, drained, and dredged accordingly. If necessary, the internal part of the pipeline shall be treated (such as local deformation recovery), so as to ensure that the quality of the overturned lining meets the requirements.

Before the materials enter the site, a turnover platform shall be set up at the inversion wellhead.

 

(3) Heating

A hot water boiler is used to heat the flexible liner cylinder circularly. By continuously raising the temperature of the water in the pipeline, the resin will react. After reaching a certain temperature (about 85 ℃) for a certain time, the pipeline repair will be cured and completed.

 

(4) Tail end treatment

After the pipe is cooled, the excess part at the tail end of the pipe shall be cut off to keep it level with the pipe orifice. At the same time, the pipe interface shall be grouted to integrate the new pipe and the old pipe, so as to complete the CIPP lining repair of the pipe.

 

Function  Underground pipe repair
Inversion  Water
Cure  Hot water
Diameters  DN1800mm

 

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig 0

sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2026 Daoyunai Energy Saving Technology Limited . All Rights Reserved.