logo
Send Message
products
PRODUCTS DETAILS
Home > Products >
Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

MOQ: 57 m
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 330 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Fiberglass Saturated Resin
Diameter:
DN1000
Thickness:
10mm
Length:
115m
Weight:
Variable
Life:
50 Years
Highlight:

UV-Cured CIPP Lining DAO

,

uv cipp equipment Cured DAO

,

uv cipp equipment Lining DAO

Product Description

Fiberglass saturated resin installation for underground pipelines by no excavation

 

UV CIPP trenchless construction for sewer repair

 

At the same time as pulling the liner, the operator at the bottom of the inspection well shall be in place to assist the hose at all times to ensure that it is always at the bottom of the pipe without touching the top of the pipe.

If the material diameter is greater than or equal to DN600, it is recommended to apply grease or detergent water at the bottom of the material or above the bottom film to reduce friction.

At the same time, pay attention to the flatness of the material at all times to ensure that it is not knotted or bent. Otherwise, once the material enters the pipeline, it will be difficult to fully expand in case of winding, resulting in waste and economic losses.

At the end of the manhole section, the person responsible for dragging the bottom film and hose should use a hoist, which requires 3-5 tons.

Always pay attention to the safety of operators at the bottom of the manhole.

For the pipes below DN600, the lamp chain shall be used for curing, and the installation of the stainless steel tie at one end and the assembly of the lamp chain shall be completed on the ground.

For pipelines above DN600, the lamp holder shall be used for curing. If the manhole or wellhead is too small, the installation of stainless steel binding head and the assembly of the lamp holder shall be completed inside the pipeline.

When the hose is still 5 meters long, stop dragging and start to install stainless steel ties.

 

 Function  Trenchless repair
 Application  Cured-in-place-pipe
 Length  Any length is possible

 

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation 0

products
PRODUCTS DETAILS
Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation
MOQ: 57 m
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 330 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Fiberglass Saturated Resin
Diameter:
DN1000
Thickness:
10mm
Length:
115m
Weight:
Variable
Life:
50 Years
Minimum Order Quantity:
57 m
Price:
Variable
Packaging Details:
Normal
Delivery Time:
15 working days
Payment Terms:
T/T
Supply Ability:
330 km per year
Highlight

UV-Cured CIPP Lining DAO

,

uv cipp equipment Cured DAO

,

uv cipp equipment Lining DAO

Product Description

Fiberglass saturated resin installation for underground pipelines by no excavation

 

UV CIPP trenchless construction for sewer repair

 

At the same time as pulling the liner, the operator at the bottom of the inspection well shall be in place to assist the hose at all times to ensure that it is always at the bottom of the pipe without touching the top of the pipe.

If the material diameter is greater than or equal to DN600, it is recommended to apply grease or detergent water at the bottom of the material or above the bottom film to reduce friction.

At the same time, pay attention to the flatness of the material at all times to ensure that it is not knotted or bent. Otherwise, once the material enters the pipeline, it will be difficult to fully expand in case of winding, resulting in waste and economic losses.

At the end of the manhole section, the person responsible for dragging the bottom film and hose should use a hoist, which requires 3-5 tons.

Always pay attention to the safety of operators at the bottom of the manhole.

For the pipes below DN600, the lamp chain shall be used for curing, and the installation of the stainless steel tie at one end and the assembly of the lamp chain shall be completed on the ground.

For pipelines above DN600, the lamp holder shall be used for curing. If the manhole or wellhead is too small, the installation of stainless steel binding head and the assembly of the lamp holder shall be completed inside the pipeline.

When the hose is still 5 meters long, stop dragging and start to install stainless steel ties.

 

 Function  Trenchless repair
 Application  Cured-in-place-pipe
 Length  Any length is possible

 

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation 0

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.