logo
products
PRODUCTS DETAILS
Home > Products >
UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig

MOQ: 10m
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 340 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Lining Sewers
Diameter:
DN300
Thickness:
3mm
Length:
460m
Weight:
Variable
Life:
50 Years
Highlight:

uv lining processing DAO

,

DAO uv pipes coating

,

DAO uv linings process

Product Description

UV light curing inner repair sewer liner by CIPP process no need digging

 

The UV light curing inner repair liner (hereinafter referred to as the liner) comprises the inner membrane, resin-impregnated glass fiber, outer membrane, and ultraviolet protective film from the inside to the outside.

 

1-Protective film: the plastic film on the outermost layer of the hose to protect the hose from ultraviolet radiation and avoid scratches during storage, transportation, pulling, etc.

 

2-Outer membrane: the plastic film on the second outer layer of the hose. The outer film material is a complete barrel film without the interface, which can better protect the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and make the resin evenly distributed when the hose is inflated.

 

3-Glass fiber fabric: the main part of the hose is used to absorb the curing glue, increasing the pipe's strength after curing.

 

4-Inner membrane: the plastic film at the innermost layer of the hose, which protects the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and makes the resin as evenly distributed as possible when the hose is inflated. After the hose is cured, the inner membrane shall be pulled out of the inner liner.

 

 How  Plugging 
 Application  Rain storm
 Length  Any length is possible

 

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig 0

Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

W
Wang Wei
China (Mainland) Apr 20.2025
UV CIPP is a new technology for sewer trenchless repair. Daoyunai sells more than 300km per year. The best that I have used.
M
Martin
Hong Kong Jul 19.2024
The pump is so powerful for draining water from the deep sewer to far away. Its adjustable controller makes the job easier to control.
M
Mario
Colombia Oct 4.2022
Its jetting nozzles for cleaning the sewer, and its power will make the sewer clean.
products
PRODUCTS DETAILS
UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig
MOQ: 10m
Price: Variable
Standard Packaging: Normal
Delivery Period: 15 working days
Payment Method: T/T
Supply Capacity: 340 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Lining Sewers
Diameter:
DN300
Thickness:
3mm
Length:
460m
Weight:
Variable
Life:
50 Years
Minimum Order Quantity:
10m
Price:
Variable
Packaging Details:
Normal
Delivery Time:
15 working days
Payment Terms:
T/T
Supply Ability:
340 km per year
Highlight

uv lining processing DAO

,

DAO uv pipes coating

,

DAO uv linings process

Product Description

UV light curing inner repair sewer liner by CIPP process no need digging

 

The UV light curing inner repair liner (hereinafter referred to as the liner) comprises the inner membrane, resin-impregnated glass fiber, outer membrane, and ultraviolet protective film from the inside to the outside.

 

1-Protective film: the plastic film on the outermost layer of the hose to protect the hose from ultraviolet radiation and avoid scratches during storage, transportation, pulling, etc.

 

2-Outer membrane: the plastic film on the second outer layer of the hose. The outer film material is a complete barrel film without the interface, which can better protect the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and make the resin evenly distributed when the hose is inflated.

 

3-Glass fiber fabric: the main part of the hose is used to absorb the curing glue, increasing the pipe's strength after curing.

 

4-Inner membrane: the plastic film at the innermost layer of the hose, which protects the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and makes the resin as evenly distributed as possible when the hose is inflated. After the hose is cured, the inner membrane shall be pulled out of the inner liner.

 

 How  Plugging 
 Application  Rain storm
 Length  Any length is possible

 

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig 0

sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.