logo
Products
PRODUCTS DETAILS
Home > Products >
CIPP Wet Out Lining Cured In Place Pipe Process International City Pipes Repair W/O Digging

CIPP Wet Out Lining Cured In Place Pipe Process International City Pipes Repair W/O Digging

MOQ: 70m
Price: Variable
Standard Packaging: Customized as required
Delivery Period: 10 working days
Payment Method: T/T
Supply Capacity: 300 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Lining Hose
Diameter:
DN1250
Thickness:
13mm
Length:
110m
Weight:
Variable
Life:
50 Years
Highlight:

cipp cured in place pipe process

,

cured in place pipe lining process

,

cipp wet out process

Product Description

Construction material used for international city pipes repair w/o digging

 

The UV curing overall repair lining material is made of unsaturated polyester resin, which has the characteristics of convenient curing, strong adhesion, and low shrinkage. The lining material is made of high-strength glass fiber, which can significantly reduce the wall thickness, greatly reduce the weight of the overall lining material, save the installation cost, and provide a stronger ring direction tensile performance for resistance to pressure.

 

Scope of application:

1. it can match various pipe geometric sections, including round, square, horseshoe, etc.

2. Is suitable for rain and sewage drainage pipes made of reinforced concrete, cement, metal, and various plastic materials It can repair the structural defects of the pipeline: fracture, deformation, dislocation, disconnection, leakage, corrosion, etc.

  • it is applicable to repair local sand holes, exposed stones, spalling and other diseases on the inner wall of the pipeline
  • It is applicable to the preventive repair when the pipeline-interface is in the leakage omen period or critical state.
  • Applicable pipe diameter range: DN200-DN1600.

 

 How to  Without digging
 Application  Sewers and storm
 Length  Any length is possible

 

CIPP Wet Out Lining Cured In Place Pipe Process International City Pipes Repair W/O Digging 0

Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

D
David
India Feb 18.2025
We really like Daoyunai's design and nice ideas for the construction. It is more durable and easier to control.
M
Mohmand
United Arab Emirates Nov 12.2024
We used many km of Daoyunai UV liners, from DN300-DN1500, and max DN2000. Its quality is great.
M
Martin
Hong Kong Jul 19.2024
The pump is so powerful for draining water from the deep sewer to far away. Its adjustable controller makes the job easier to control.
Products
PRODUCTS DETAILS
CIPP Wet Out Lining Cured In Place Pipe Process International City Pipes Repair W/O Digging
MOQ: 70m
Price: Variable
Standard Packaging: Customized as required
Delivery Period: 10 working days
Payment Method: T/T
Supply Capacity: 300 km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Material:
Lining Hose
Diameter:
DN1250
Thickness:
13mm
Length:
110m
Weight:
Variable
Life:
50 Years
Minimum Order Quantity:
70m
Price:
Variable
Packaging Details:
Customized as required
Delivery Time:
10 working days
Payment Terms:
T/T
Supply Ability:
300 km per year
Highlight

cipp cured in place pipe process

,

cured in place pipe lining process

,

cipp wet out process

Product Description

Construction material used for international city pipes repair w/o digging

 

The UV curing overall repair lining material is made of unsaturated polyester resin, which has the characteristics of convenient curing, strong adhesion, and low shrinkage. The lining material is made of high-strength glass fiber, which can significantly reduce the wall thickness, greatly reduce the weight of the overall lining material, save the installation cost, and provide a stronger ring direction tensile performance for resistance to pressure.

 

Scope of application:

1. it can match various pipe geometric sections, including round, square, horseshoe, etc.

2. Is suitable for rain and sewage drainage pipes made of reinforced concrete, cement, metal, and various plastic materials It can repair the structural defects of the pipeline: fracture, deformation, dislocation, disconnection, leakage, corrosion, etc.

  • it is applicable to repair local sand holes, exposed stones, spalling and other diseases on the inner wall of the pipeline
  • It is applicable to the preventive repair when the pipeline-interface is in the leakage omen period or critical state.
  • Applicable pipe diameter range: DN200-DN1600.

 

 How to  Without digging
 Application  Sewers and storm
 Length  Any length is possible

 

CIPP Wet Out Lining Cured In Place Pipe Process International City Pipes Repair W/O Digging 0

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2026 Daoyunai Energy Saving Technology Limited . All Rights Reserved.