logo
products
PRODUCTS DETAILS
Home > Products >
Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

MOQ: 1 unit
Price: Variable
Standard Packaging: Normal
Delivery Period: 25 working days
Payment Method: T/T
Supply Capacity: 20 units per month
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
D919
Purpose:
City Pipe Repair
Composition:
Two Blowers, Cable, Video, Cure
Cable Reel:
190 Meters
Light:
High Voltage Mercury
Diameter:
DN300-1500
Color:
Blank Or Printed As Required
Highlight:

Cured-In-Place-Pipe Uv Cipp Lining

,

DAO Uv Cipp Linings Companies

,

cured-in-place-pipe cipp lining

Product Description

UV CIPP (Cured-In-Place-Pipe) manufactured for city pipe repair without digging

Regulations on fixing the bottom film:

 

      The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process.

 

      After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.

 

Drag liner material: the material head is locked:

 

      Before the materials are taken out of the wooden box, a cloth about 3M wide and 7-8m long shall be laid on the ground in advance to protect the materials. Place the material on the cloth when taking it out.

1. The material shall be horizontally folded in half to an appropriate width, about one-third, and then vertically folded in half by 50 cm (the length of the longitudinal folding can be adjusted appropriately according to the site conditions).

2. Fold the lifting belt in the middle, and wrap the folded material head with a rope tightener until it cannot fall off (the metal buckle is placed in the middle of the upper part).

 

       And wrap it with adhesive tape.

 

      Finally, link the material pulling rope with the lifting belt with shackles and lock it firmly. If the material is long or large, a universal shaft needs to be added in the middle. (universal shaft must be added when dragging materials with steel wire rope.)

 

 Bottom film  1/3 of the pipe size for protecting
 Liner head  Locked
 Key points  slowly and carefully

 

 

 

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging 0

 

 

 

products
PRODUCTS DETAILS
Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging
MOQ: 1 unit
Price: Variable
Standard Packaging: Normal
Delivery Period: 25 working days
Payment Method: T/T
Supply Capacity: 20 units per month
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
D919
Purpose:
City Pipe Repair
Composition:
Two Blowers, Cable, Video, Cure
Cable Reel:
190 Meters
Light:
High Voltage Mercury
Diameter:
DN300-1500
Color:
Blank Or Printed As Required
Minimum Order Quantity:
1 unit
Price:
Variable
Packaging Details:
Normal
Delivery Time:
25 working days
Payment Terms:
T/T
Supply Ability:
20 units per month
Highlight

Cured-In-Place-Pipe Uv Cipp Lining

,

DAO Uv Cipp Linings Companies

,

cured-in-place-pipe cipp lining

Product Description

UV CIPP (Cured-In-Place-Pipe) manufactured for city pipe repair without digging

Regulations on fixing the bottom film:

 

      The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process.

 

      After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.

 

Drag liner material: the material head is locked:

 

      Before the materials are taken out of the wooden box, a cloth about 3M wide and 7-8m long shall be laid on the ground in advance to protect the materials. Place the material on the cloth when taking it out.

1. The material shall be horizontally folded in half to an appropriate width, about one-third, and then vertically folded in half by 50 cm (the length of the longitudinal folding can be adjusted appropriately according to the site conditions).

2. Fold the lifting belt in the middle, and wrap the folded material head with a rope tightener until it cannot fall off (the metal buckle is placed in the middle of the upper part).

 

       And wrap it with adhesive tape.

 

      Finally, link the material pulling rope with the lifting belt with shackles and lock it firmly. If the material is long or large, a universal shaft needs to be added in the middle. (universal shaft must be added when dragging materials with steel wire rope.)

 

 Bottom film  1/3 of the pipe size for protecting
 Liner head  Locked
 Key points  slowly and carefully

 

 

 

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging 0

 

 

 

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.