logo
Send Message
Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Home ProductsUV Cured CIPP

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Certification
China Daoyunai Energy Saving Technology Limited certification
China Daoyunai Energy Saving Technology Limited certification
DaoYunAi company's products and technological services are truly exceptional. Their innovative approach to technology solutions sets them apart in the industry. The quality of their products is outstanding, delivering cutting-edge solutions that meet the highest standards. Additionally, their dedication to customer service is commendable.

—— John

DAO is my supplier for over five years. Its UV cure system and liner, its CCTV crawler are my great tools to finish trenchless repair underground pipelines. DAO, Amazing! Lily Zhang

—— Lily

I have been dealing with Daoyunai company for underground pipeline trenchless repair for almost seven years. I am the distributor in Jiangxi province. DAO always gives me support to win customers. Win-Win!! Dongzhen

—— Dongzhen

It is very nice to do business with DAO and also Aaron is very helpful. DAO UV liner is very good, stable and fast to cure. I hope to visit your factory in 2023. Ali

—— Ali

DAO is a very trustworthy company, I like it. Its UV cure system is very easy to operate, and its liner is pretty good. Aaron is very active. I like them. Johnny

—— Johnny

I'm Online Chat Now

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab
Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Large Image :  Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Product Details:
Place of Origin: Jiangsu, China
Brand Name: DAO
Model Number: D919
Payment & Shipping Terms:
Minimum Order Quantity: 1 unit
Price: Variable
Packaging Details: Normal
Delivery Time: 20 working days
Payment Terms: T/T
Supply Ability: 20 units per month
Detailed Product Description
Function: Large Diameter Sewer Trenchless Reha Component: Blower, Cable, Video, Cure
Cable Reel: 180 Meters Light: Mercury Or LED
Diameter: DN650-1650 Color: Blank Or Printed
Highlight:

zero dig trenchless pipe repairs DAO

,

trenchless pipe repair equipments DAO

,

trenchless sewer repair

Large diameter municipal sewer trenchless No-Dig rehab by CIPP UV technology

Preparation of UV curing construction instructions:

 

The drainage pipeline is gravity flow. The upstream (the front section in the downstream direction) and downstream (the rear section in the downstream direction) of the pipeline shall be determined in advance, so as to determine the sequence of repairing dragging materials.

If the site space allows, it is suggested to drag the bottom film and materials in the following order: starting from the upstream direction and dragging along the downstream direction.

 

1. pretreatment:

Ventilation, water stop, pumping, dredging, and cleaning. Ensure that there is no ponding, water leakage, foreign matter, serious deformation or dislocation, and other defects inside the pipeline.

 

2. robot CCTV inspection to determine whether it can be repaired

 

3. pull the bottom film with a robot: (use braided rope, do not replace the rope at will, otherwise the material or membrane will rotate in the pipe)

The connection buckle between the rope head and the bottom membrane shall be firmly fastened, and another rope for pulling materials shall be put on the upper end of the bottom membrane (if a winch is used, it shall be a steel wire rope). During the membrane pulling process, ensure that the materials and ropes are not mixed with the rotation of the bottom membrane.

 

For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.

 

UV Cure Trenchless Construction
Pipe diameter  DN600-1200
Light source  LED or Mercury is available
Temperature  Two sensors for temperature monitoring
Leg  Interchanged as needed.
Other features are available to be custom-made.

 

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab 0

 

 

 

Contact Details
Daoyunai Energy Saving Technology Limited

Contact Person: Aaron Wang

Tel: +8613641967601

Send your inquiry directly to us (0 / 3000)