logo
Send Message
products
PRODUCTS DETAILS
Home > Products >
Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG

Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG

MOQ: 30m
Price: Variable
Standard Packaging: Variable
Delivery Period: 15 workding days
Payment Method: T/T
Supply Capacity: 1000km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Certification
TUV
Model Number
DN200-1650
Material:
Fiberglass With Resin
Structure:
4 Layers
Diameter:
From DN200-1650
Thickness:
Customer Made
Color:
Customer Made
Length:
Customer Made
Highlight:

DN200-1650 cipp water mains linings

,

DN200-1650 Relinings CIPP Uv Linings

,

CIPP Uv Lining Water Mains DN200 1650

Product Description

CIPP-UV material for municipal sewers repair DN200-1650 by NO-DIG

 

DAO CIPP-UV cure material is designed for underground municipal sewer trenchless repair using Cured-in-Place-Pipe technology. It is good to use the newly developed LED cure system or the traditional voltage Mercury light cure system, both types work great!

 

UV cure liner material features below:

1. The repaired pipeline structure meets the strength, stability, and deformation requirements TUV test report.

2. After repair, the pipeline is smooth and the water stream will be better.

3. The service life is more than 50 years according to the 10000hours creep test report by TUV.

4. Good ductility and fit the pipe wall closely, without holes.

 

Product parameters
Bending modulus (MPA) ≥ 3100
Bending strength (MPA) ≥ 120
Tensile modulus (MPA) ≥ 3200
Tensile strength (MPA) ≥ 82
Mild bending resistance (MPA) ≥ 47
Short term bending elastic modulus (MPA) ≥ 6670
Tensile strength (MPA) ≥ 61
Applicable pipe diameter DN200-DN1650

 

Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG 0

products
PRODUCTS DETAILS
Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG
MOQ: 30m
Price: Variable
Standard Packaging: Variable
Delivery Period: 15 workding days
Payment Method: T/T
Supply Capacity: 1000km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Certification
TUV
Model Number
DN200-1650
Material:
Fiberglass With Resin
Structure:
4 Layers
Diameter:
From DN200-1650
Thickness:
Customer Made
Color:
Customer Made
Length:
Customer Made
Minimum Order Quantity:
30m
Price:
Variable
Packaging Details:
Variable
Delivery Time:
15 workding days
Payment Terms:
T/T
Supply Ability:
1000km per year
Highlight

DN200-1650 cipp water mains linings

,

DN200-1650 Relinings CIPP Uv Linings

,

CIPP Uv Lining Water Mains DN200 1650

Product Description

CIPP-UV material for municipal sewers repair DN200-1650 by NO-DIG

 

DAO CIPP-UV cure material is designed for underground municipal sewer trenchless repair using Cured-in-Place-Pipe technology. It is good to use the newly developed LED cure system or the traditional voltage Mercury light cure system, both types work great!

 

UV cure liner material features below:

1. The repaired pipeline structure meets the strength, stability, and deformation requirements TUV test report.

2. After repair, the pipeline is smooth and the water stream will be better.

3. The service life is more than 50 years according to the 10000hours creep test report by TUV.

4. Good ductility and fit the pipe wall closely, without holes.

 

Product parameters
Bending modulus (MPA) ≥ 3100
Bending strength (MPA) ≥ 120
Tensile modulus (MPA) ≥ 3200
Tensile strength (MPA) ≥ 82
Mild bending resistance (MPA) ≥ 47
Short term bending elastic modulus (MPA) ≥ 6670
Tensile strength (MPA) ≥ 61
Applicable pipe diameter DN200-DN1650

 

Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG 0

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.