logo
Send Message
English
Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Home ProductsTrenchless Pipeline Construction

Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

Certification
China Daoyunai Energy Saving Technology Limited certification
China Daoyunai Energy Saving Technology Limited certification
DaoYunAi company's products and technological services are truly exceptional. Their innovative approach to technology solutions sets them apart in the industry. The quality of their products is outstanding, delivering cutting-edge solutions that meet the highest standards. Additionally, their dedication to customer service is commendable.

—— John

DAO is my supplier for over five years. Its UV cure system and liner, its CCTV crawler are my great tools to finish trenchless repair underground pipelines. DAO, Amazing! Lily Zhang

—— Lily

I have been dealing with Daoyunai company for underground pipeline trenchless repair for almost seven years. I am the distributor in Jiangxi province. DAO always gives me support to win customers. Win-Win!! Dongzhen

—— Dongzhen

It is very nice to do business with DAO and also Aaron is very helpful. DAO UV liner is very good, stable and fast to cure. I hope to visit your factory in 2023. Ali

—— Ali

DAO is a very trustworthy company, I like it. Its UV cure system is very easy to operate, and its liner is pretty good. Aaron is very active. I like them. Johnny

—— Johnny

I'm Online Chat Now

Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing
Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

Large Image :  Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

Product Details:
Place of Origin: Jiangsu, China
Brand Name: DAO
Payment & Shipping Terms:
Minimum Order Quantity: 10m
Price: Variable
Packaging Details: Normal
Delivery Time: 15 working days
Payment Terms: T/T
Supply Ability: 340 km per year
Detailed Product Description
Material: Protective Bottom Film Diameter: DN400
Thickness: 4mm Length: 160m
Weight: Variable Life: 50 Years
Highlight:

trenchless pvc pipe repair

,

trenchless sewer relining

,

DAO underground trenchless machines

Protective bottom film installing for trenchless pipeline CIPP repair construction

 

Protective bottom film for UV trenchless operation

The protective bottom film plays a role in protecting the lining hose, preventing the lining hose from being scratched and damaged by protrusions during pulling in.

The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process. After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.

 

Important information:

The hardening rate depends on the geometry of the pipe, the wall thickness of the hose lining, the distance from the curing light source used to the lining pipe, the radiation intensity, etc., and is affected by the main conditions of the construction site (water, temperature, the material of the pipeline to be repaired, etc.). The above values are indicative of the maximum hardening rate.

If vinyl ester resin is used for hardening, the speed shall be reduced by 30-35%, and the pressure in the pipe is recommended to be between the specified minimum and maximum values.

The temperature resulting from curing shall be continuously between 80 ° C and 140 ° C maximum. If this level cannot be maintained under the set parameters, the hardening speed shall be adjusted to reach this level.

 

 How  Pulling
 Application  Rainstorm
 Length  Any length is possible

 

Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing 0

Contact Details
Daoyunai Energy Saving Technology Limited

Contact Person: Aaron Wang

Tel: +8613641967601

Send your inquiry directly to us (0 / 3000)