logo
Send Message
products
PRODUCTS DETAILS
Home > Products >
Trenchless CIPP Lining Water Inversion Through 90 Degrees Elbows Sewage System Repair

Trenchless CIPP Lining Water Inversion Through 90 Degrees Elbows Sewage System Repair

MOQ: 10m
Price: Variable
Standard Packaging: Variable
Delivery Period: 15 workding days
Payment Method: T/T
Supply Capacity: 500km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
DN800-1800
Material:
Felts Welded
Structure:
4 Layers
Diameter:
From DN800-1800
Thickness:
From 8mm-20mm
Color:
Original
Length:
From 10m To 200m
Highlight:

90 degrees elbow CIPP lining water inversion

,

90 degrees elbow CIPP linings water inversions

,

90 degrees elbow CIPP lining DAO

Product Description

CIPP lining water inversion through 90 degrees elbows for trenchless repair sewage

 

Since the 1980s, the CIPP water inversion lining method has been widely used in the renovation of water supply and drainage, gas, and petrochemical pipelines all over the world. It has been widely recognized for its advantages of fast construction speed, good pipe quality, and small floor area.

 

CIPP water inversion lining method can be applied to the renovation and repair of pipelines with diameters ranging from 100 mm to 3000 mm. In the field of drainage, the on-site curing method can even repair huge pipelines of more than two meters. Old pipe materials include cast iron, steel, concrete, plastic, etc. The liner of the on-site curing process can pass through 45 degrees or even 90 degrees elbows (depending on the specific situation), and the length of each pipe can reach hundreds of meters.

 

Namely, the in-situ solidification method, which is commonly called the water inversion method in China, refers to the trenchless repair method for sewer sewage channels and water supply pipelines. This repair method has little environmental pollution, little impact on traffic, no disturbance to residents, and low carbon. It is the latest Western technology introduced in China. The principle is to make a new pipe inside the original pipe, which has independent structural strength and can independently support external pressure and internal water pressure.

 

Municipal Underground rainwater pipelines and sewage pipelines often suffer from corrosion, water leakage, and dislocation, resulting in social problems such as surface water accumulation, pavement collapse, and pavement settlement. And corrosion and rupture of water supply pipelines, resulting in a large waste of water resources and the safety of people's property and life.

 

 

Function  Underground gravity pipe trenchless repair
Inversion  Water gravity
Cure  How water
Diameters  From DN100-3000mm

 

Trenchless CIPP Lining Water Inversion Through 90 Degrees Elbows Sewage System Repair 0

products
PRODUCTS DETAILS
Trenchless CIPP Lining Water Inversion Through 90 Degrees Elbows Sewage System Repair
MOQ: 10m
Price: Variable
Standard Packaging: Variable
Delivery Period: 15 workding days
Payment Method: T/T
Supply Capacity: 500km per year
Detail Information
Place of Origin
Jiangsu, China
Brand Name
DAO
Model Number
DN800-1800
Material:
Felts Welded
Structure:
4 Layers
Diameter:
From DN800-1800
Thickness:
From 8mm-20mm
Color:
Original
Length:
From 10m To 200m
Minimum Order Quantity:
10m
Price:
Variable
Packaging Details:
Variable
Delivery Time:
15 workding days
Payment Terms:
T/T
Supply Ability:
500km per year
Highlight

90 degrees elbow CIPP lining water inversion

,

90 degrees elbow CIPP linings water inversions

,

90 degrees elbow CIPP lining DAO

Product Description

CIPP lining water inversion through 90 degrees elbows for trenchless repair sewage

 

Since the 1980s, the CIPP water inversion lining method has been widely used in the renovation of water supply and drainage, gas, and petrochemical pipelines all over the world. It has been widely recognized for its advantages of fast construction speed, good pipe quality, and small floor area.

 

CIPP water inversion lining method can be applied to the renovation and repair of pipelines with diameters ranging from 100 mm to 3000 mm. In the field of drainage, the on-site curing method can even repair huge pipelines of more than two meters. Old pipe materials include cast iron, steel, concrete, plastic, etc. The liner of the on-site curing process can pass through 45 degrees or even 90 degrees elbows (depending on the specific situation), and the length of each pipe can reach hundreds of meters.

 

Namely, the in-situ solidification method, which is commonly called the water inversion method in China, refers to the trenchless repair method for sewer sewage channels and water supply pipelines. This repair method has little environmental pollution, little impact on traffic, no disturbance to residents, and low carbon. It is the latest Western technology introduced in China. The principle is to make a new pipe inside the original pipe, which has independent structural strength and can independently support external pressure and internal water pressure.

 

Municipal Underground rainwater pipelines and sewage pipelines often suffer from corrosion, water leakage, and dislocation, resulting in social problems such as surface water accumulation, pavement collapse, and pavement settlement. And corrosion and rupture of water supply pipelines, resulting in a large waste of water resources and the safety of people's property and life.

 

 

Function  Underground gravity pipe trenchless repair
Inversion  Water gravity
Cure  How water
Diameters  From DN100-3000mm

 

Trenchless CIPP Lining Water Inversion Through 90 Degrees Elbows Sewage System Repair 0

Sitemap |  Privacy Policy | China Good Quality UV CIPP Equipment Supplier. Copyright © 2022-2025 Daoyunai Energy Saving Technology Limited . All Rights Reserved.