Send Message
Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Home ProductsTrenchless Pipeline Construction

Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages

Certification
China Daoyunai Energy Saving Technology Limited certification
China Daoyunai Energy Saving Technology Limited certification
DAO is a very trustworthy company, I like it. Its UV cure system is very easy to operate, and its liner is pretty good. DAO is my great partner. Johnny

—— Johnny

DAO is my supplier for over five years. Its UV cure system and liner, its CCTV crawler are my great tools to finish trenchless repair underground pipelines. DAO, Amazing! Lily Zhang

—— Lily

I have been dealing with Daoyunai company for underground pipeline trenchless repair for almost seven years. I am the distributor in Jiangxi province. DAO always gives me support to win customers. Win-Win!! Dongzhen

—— Dongzhen

It is very nice to do business with DAO and also Aaron is very helpful. DAO UV liner is very good, stable and fast to cure. I hope to visit your factory in 2023. Ali

—— Ali

I'm Online Chat Now

Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages

Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages
Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages

Large Image :  Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages

Product Details:
Place of Origin: Jiangsu, China
Brand Name: DAO
Payment & Shipping Terms:
Minimum Order Quantity: 40m
Price: Variable
Packaging Details: Normal
Delivery Time: 15 working days
Payment Terms: T/T
Supply Ability: 30 km per month
Detailed Product Description
Material: Hose Diameter: DN1450
Thickness: 14mm Length: 60m
Environment: Environment Protection Life: 50 Years
High Light:

trenchless rehabilitation of underground pipes

,

DAO trenchless rehabs

,

trenchless sewer rehabilitation

Trenchless rehab construction for no-digging repair underground sewages

 

Liner pulls in

 

1) Before pulling in the hose, it is advisable to set up a roller or fixed pulley at the wellhead and pipe orifice where the traction direction is changed. The roller or fixed pulley should be positioned and fixed with a lead screw. In the process of pulling in the hose, the place that may be in direct contact with other objects should be padded with protective film.

2) The connection between the hose and the winch traction wire rope shall meet the following requirements:

The hoist shall be placed in the opposite well of the hose blanking opening. The hoist shall be reliably specified, and the power-on test shall be normal;

The universal hook shall be selected for the hook between the front end of the hoist wire rope and the material connecting part to ensure that the hose can smoothly enter the pipe during the traction of the hoist;

Pull the steel wire rope through the pipe and connect with the hose through the pull rope inserted during the bottom membrane insertion.

3) Pretreatment of the hose before blanking

First, fold the two sides of the hose material with the end length of about 0.5m inward by 1/3, then fold it longitudinally, and place a lifting belt at the bottom of the folding line (the lifting belt is connected with the winch hook);

The folded part shall be fastened with 2 straps, and the outside shall be wrapped with a bottom film for protection,

4) Pull the hose. The hose pulled into the old pipe shall meet the following requirements:

Start the hoist, the pulling speed shall be controlled within 5m/min, the inching operation can be carried out according to the feeding condition of the hose, and the contact between the hose end and the hoist operator shall be maintained. It is recommended to use the interphone for real-time call control;

In the process of pulling in the hose, the operators at the end of the hose shall ensure that the bottom film does not move, and check the laying of the hose to see if it moves smoothly on the bottom film;

When the length of the hose outside the well mouth is close to the depth of the well, the winch shall be stopped, the tail of the hose shall be fastened with the thick rope with a tie, and the thick rope shall be tightened in the direction, and the winch shall be started again until the tail of the hose exceeds the pipe mouth by about 0.5m.

 

 

 How  No digging
 Application  Public or private sewers
 Length  Any length is possible

 

Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground Sewages 0

Contact Details
Daoyunai Energy Saving Technology Limited

Contact Person: Aaron Wang

Tel: +8613641967601

Send your inquiry directly to us (0 / 3000)