50 Year UV CIPP Liner Sewer Repair No Dig

Other Videos
January 05, 2026
Category Connection: UV CIPP Lining
Brief: In this video, we provide an informative overview of the UV CIPP Liner, a trenchless sewer repair solution. You'll see how this 50-year durable liner is installed using the pull-in method and cured with advanced UV technology. Gain concise insights into the features that matter most for real-world use, including the efficient curing process and long-term performance benefits for pipeline rehabilitation.
Related Product Features:
  • Designed for a 50-year service life, providing a long-lasting solution for pipeline rehabilitation.
  • Utilizes advanced UV curing technology with the D919 UV equipment for precise and controlled hardening.
  • Features a quick curing time of just 2-4 hours, enabling faster project completion.
  • Made from high-strength, resin-impregnated fiberglass material for durability and reliability.
  • Employs a trenchless, no-dig installation method via pull-in, minimizing surface disruption.
  • Operates effectively within a temperature range of 60-120 degrees Celsius during curing.
  • Backed by a 6-month warranty, ensuring customer satisfaction and product performance.
  • Certified with ISO9001, reflecting high manufacturing standards and quality assurance.
FAQs:
  • What is the expected lifespan of the UV CIPP Liner?
    The UV CIPP Liner is engineered to last for 50 years, offering a durable and long-term solution for sewer and pipeline repair without the need for excavation.
  • How is the UV CIPP Liner installed and cured?
    Installation is performed using a trenchless pull-in method. The liner is inserted into the existing pipe and then cured using specialized D919 UV equipment, which hardens it in just 2-4 hours.
  • What certifications does the DAO UV CIPP Liner hold?
    The DAO UV CIPP Liner is manufactured in China and is certified with ISO9001, ensuring it meets international quality management standards.
  • What is the minimum order quantity and typical delivery time?
    The minimum order quantity is 10 meters, and delivery typically takes 1-2 weeks, with packaging securely boxed in containers for safe transit.