UV CIPP Liner DN100 Pull-in Installation for Fast and No Dig Repair Lateral

UV CIPP Lining
April 07, 2025
Category Connection: UV CIPP Lining
Brief: Discover the UV CIPP Liner DN100 Pull-in Installation, a fast and no-dig solution for lateral pipe repair. Made in China, this resin-impregnated fiberglass liner offers durability, quick curing (2-4 hours), and a 50-year lifespan. Perfect for residential, commercial, and industrial projects.
Related Product Features:
  • Made from resin-impregnated fiberglass for high durability.
  • Quick curing time of 2-4 hours for efficient project completion.
  • Pull-in installation method ensures easy and fast setup.
  • Withstands temperatures from 60-120 degrees for versatile use.
  • Low maintenance requirements save time and effort.
  • Backed by a 6-month warranty for quality assurance.
  • 50-year lifespan ensures long-term reliability.
  • Cost-effective solution for budget-conscious projects.
Faqs:
  • What is the curing time for the UV CIPP Liner?
    The UV CIPP Liner has a quick curing time of 2-4 hours, allowing for efficient project completion.
  • What is the lifespan of the UV CIPP Liner?
    The UV CIPP Liner is designed to last up to 50 years, providing long-term durability and reliability.
  • What is the installation method for the UV CIPP Liner?
    The UV CIPP Liner uses a pull-in installation method, ensuring a fast and easy setup process.