Ultraviolet UV CIPP Equipment Services Dual Blowers Expanding Liner During Trenchless

Other Videos
May 28, 2024
Category Connection: UV CIPP Equipment
Brief: Discover the advanced Blowing Hose UV CIPP Equipment for trenchless sewer repair. This video showcases how dual blowers expand the liner during UV CIPP curing, ensuring smooth, wrinkle-free results. Learn the step-by-step process and precautions for optimal performance in municipal construction.
Related Product Features:
  • Blowing hose designed for UV CIPP cure equipment in trenchless sewer repair.
  • Dual blowers ensure even expansion of the liner for wrinkle-free curing.
  • Simple operation process with clear startup and shutdown procedures.
  • Adjustable blower power to maintain optimal pressure during curing.
  • Suitable for various pipe shapes and conditions, including winter repairs.
  • Prevents material unevenness and ensures consistent thickness.
  • Ideal for municipal construction and public sewer applications.
  • Includes safety precautions to avoid over-pressurization and material damage.
Faqs:
  • What is the purpose of the blowing hose in UV CIPP equipment?
    The blowing hose is used to expand the liner during UV CIPP curing, ensuring it fully opens and does not wrinkle, resulting in a smooth and durable repair.
  • How long should the pressure be maintained during the curing process?
    The pressure should be maintained for about 40 minutes, with curing starting approximately 15 minutes after reaching 300mbar, depending on material and environmental conditions.
  • What precautions should be taken during the inflation process?
    Inflation time and pressure should be adjusted based on laminate temperature, hose thickness, and pipe shape. Avoid insufficient pressure to prevent uneven material and excessive pressure to avoid damage.